The project included roof replacement and repairs at the following schools...
The project consisted of replacing a section of roofing (approximately 57,000 SF). The existing EPDM...
A roof condition study was performed in 2004, with construction in the summer of...
The project scope included replacement of slate roofing to this historic building. Work included...
The work consisted of replacing existing historic slate roof with new slate roofing which included...
Replace approximately 107,300 square feet of roofing. Remove the existing roofing systems...
The project consisted of replacing approx. 121,000 SF of roofing at two schools...
Replacement of approximately 300,000 square feet of roofing spread out over 33 separate roof sections...
Remove the existing roofing systems (consisting of a mechanically attached hypalon roofing membrane...
The project consisted of removing the existing roofing systems down to the...
This project involved the investigation of the premature failure of a sloped ...
This project consisted of replacing approximately 31,500 SF of steep-slope roofing and...
The project consisted of a comprehensive roof condition survey of 20 buildings ...
Removal and replacement of existing roofing including shingles, underlayment, and metal (copper) flashings...
The project consisted of replacing low-sloped roofing systems at Bourne High School with cold-process...