PROJECT ILLUSTRATIONS
|
Roof Replacement at Thurston School
Westwood, MA

| Project Scope: |
Replace approximately 18,000 SF of roofing. Remove the existing roofing system
(consisting of an asphalt-based, multi-ply, non-gravel surfaced built-up roofing
system installed over a wood deck. An overlay asphalt based roll roofing system
existed over the original built-up roofing system. An adhered EPDM roofing membrane
system with ½" fiberboard insulation existed over the roll roofing system) and install
an one half ½" recovery board and 5/8" thermal barrier, and 4 ply cold process built-up
roofing system, complete with a protective cold process flood coat and aggregate
surfacing. A complex external drainage system required tapered insulation and
additional outlets built into an intricate gutter system. Proper tie-ins to the
existing EPDM roof and cell tower structure were required.
Repairs included repointing of chimneys, new copper louver system and wood deck
replacement. Work was completed in Summer 2002.
|
| Project Cost: |
$198,500 |
| |