PROJECT ILLUSTRATIONS
|
Translucent Panel Replacement at Belmont High School
 |
 |
FIELDHOUSE |
UPPER GYMNASIUM EAST |
 |
 |
UPPER GYMNASIUM WEST |
POOL |
| Project Scope: |
This project is a continuation of the phased replacement of the High School’s translucent panels that has been occurring intermittingly. The existing original panels have been in place for over 30 years and are being replaced as funding permits.
The project included the installation of the translucent wall panel assemblies including aluminum framing, battens, closures, trim, flashings, metal flashings and associated materials. Project included removal of the existing sealants and backer rods (at the exterior brick masonry control joints), preparation of surfaces, installation of bond breaker, priming of all surfaces to receive new sealant materials, and application of new sealants.
|
| Project Cost: |
$450,000 |
| |